Overview
- A section of the sanitation tunnel under construction at 1701 Figueroa Street collapsed around 9 p.m. on July 9, blocking the only access point.
- More than 100 firefighters, including specialized confined-space and tunnel rescue teams, led a high-risk operation to reach the trapped crew.
- By early July 10, all 15 workers walked out under their own power and showed no signs of injury.
- The LAFD has ordered preventive medical evaluations for every evacuated worker as a precautionary measure.
- A formal investigation into the structural failure has been launched, renewing scrutiny of safety standards in large-scale underground projects.