Overview
- The FCC approved SpaceX's Starmind proposal on Wednesday, Nov. 25, 2026, authorizing up to 1,000,000 orbital modules intended to operate as distributed data centers for AI and other computing tasks.
- The authorization includes specific radio bands (downlink 18.8–19.3 GHz and uplink 28.6–29.1 GHz) plus telemetry and backup command links to supplement optical inter‑satellite communications.
- The agency set binding deadlines that require SpaceX to begin deployment before November 2033, place at least 100,000 modules by November 2035, and reach 50% of the system by 2038, with authorization extending through 2040.
- The FCC conditioned large‑scale rollout on technical pilot batches and audits, while SpaceX and regulators say the plan depends on Starship achieving a high launch cadence and successful in‑orbit verifications.
- Scientists, astronomy groups, the GAO and some industry rivals raised concerns about heat rejection, collision and debris risk, increased skyglow and environmental effects from frequent launches, and those groups are pressing for broader cumulative reviews.