Overview
- As of 7:45 a.m., the four right lanes were closed between exit 213 (Park Avenue) and exit 212C (20th Street), leaving only one lane open.
- CDOT reported the mishap around 6 a.m., and traffic was still reduced to a single lane at 8:30 a.m., with backups stretching for miles.
- Delays topped an hour for some drivers before 7 a.m. but eased to roughly 20 minutes by about 7:30 a.m., according to CDOT.
- The contractor is working to right the equipment and tow it off the highway, CDOT told Denver7.
- Officials had not provided an estimated time for full reopening, and it was not yet known whether anyone was injured.