Overview
- Landings and departures will be halted from 13:55 to 17:40 local time as both runways at Ezeiza are taken out of service.
- Regulators and the airport operator coordinated the work with carriers after a technical assessment in the lowest-traffic window, following recent operational strains.
- Airlines are reprogramming services, with select operations redirected to Aeroparque Jorge Newbery to keep connections moving.
- Most of the 41 affected services are domestic or short‑haul international flights.
- Passengers are advised to confirm flight status with their airline before traveling due to potential schedule changes or airport transfers.