Particle.news

Download on the App Store

Epec Schedules Friday Power Cuts for Substation Energization and Line Pruning

They will bolster network reliability through tree pruning and energization of a new underground substation

Overview

  • Villa Nueva will be without power from 08:00 to 11:00, Córdoba City faces morning and afternoon outages, Dean Funes is scheduled for 14:00–16:00 cuts and the Ausonia region will have a brief interruption at 17:00
  • Scheduled work includes medium-voltage line trimming, installation of new equipment, routine network maintenance and energization of a newly constructed substation
  • This campaign is part of Epec’s preventive maintenance strategy to reinforce aging infrastructure and prevent unscheduled blackouts
  • Residents and businesses are urged to disconnect sensitive appliances, arrange alternative lighting and maintain water reserves during the outages
  • Detailed street-level outage schedules and plans for upcoming maintenance days can be consulted on Epec’s online portal