Epec Posts Oct. 9 Power Outage Schedule Across Córdoba With Key Villa Carlos Paz Maintenance
The utility says the planned cuts support preventive upgrades to improve service reliability.
Overview
- Epec’s official timetable lists multiple short, localized interruptions throughout Thursday across the province for maintenance and network improvements.
- A notable intervention in Villa Carlos Paz is set from 15:00 to 17:00 for transformer-station work affecting numerous neighborhoods and nearby areas including Tanti, Cabalango, Estancia Vieja and Villa Santa Cruz del Lago.
- Early windows include Pascanas from 06:30 to 06:45 and Córdoba city works from 07:00 to 11:00 in Solares de Santa María II and from 07:00 to 09:30 affecting the San Francisco and Residencial Santa Ana neighborhoods.
- Additional planned outages cover aerial-line and pruning tasks in Unquillo, Tanti and San Antonio de Arredondo during the morning, with further works in Hernando from 13:00 to 14:00 and in Almafuerte, Las Bajadas and Los Cóndores from 14:00 to 16:00.
- Residents and businesses are advised to disconnect electronics, arrange alternative lighting or power and check Epec’s website for the latest schedule details.