Epec Posts Friday–Saturday Schedule of Planned Power Cuts Across Córdoba
The utility says the short interruptions enable preventive maintenance to strengthen the distribution network.
Overview
- For Friday, Aug. 29, the plan includes Ordoñez from 07:00 to 10:00, partial cuts in Córdoba capital neighborhoods, works in Molinari, and a 15‑minute interruption in Río Cuarto.
- Saturday, Aug. 30 lists staggered windows in Córdoba city and nearby localities for pruning on medium‑voltage lines, aerial line maintenance, primary distribution expansion, and work at a transformer station.
- Named areas include Don Bosco, Costa Cañada, Mariano Balcarce, Parque Capital, Alberdi, Villa Belgrano, Granja de Funes, Argüello, Silvano Funes, and Villa 9 de Julio, with partial sector impacts.
- The schedule also cites Camino a Tres Acequias, the Área Material Río Cuarto, EMOS pump sites, and localities such as Colaz, James Craik, Las Junturas, Villa Valeria, Del Campillo, Nicolás Bruzone, Mattaldi, and rural Jovita.
- Epec urges customers to disconnect electronics, plan alternative lighting and power, keep basic supplies on hand, and check its website for the latest maintenance timetable.