Overview
- Epec detailed time-bound interruptions for Friday, September 19, affecting parts of Córdoba capital, Villa Carlos Paz, Embalse, Unquillo, Cosquín, Villa de María and other zones.
- In Córdoba city, works include high-tension line maintenance in José Ignacio Díaz 3ª Sección from 08:00 to 13:30 and aerial-line tasks in Cerro La Colmena from 09:00 to 12:00.
- Short outages were scheduled in Canals and Santa María for corrective work at 06:15–07:00 and again 14:30–15:15, with additional brief cuts in Embalse and La Cruz at 07:00–07:15 and 14:30–14:45.
- Unquillo will see pruning on medium-voltage lines, including a 08:00–08:15 window covering several barrios and a separate 08:00–11:00 cut in Los Quebrachitos, plus a 10:45–11:00 interruption.
- Epec advises residents to disconnect electronics, arrange alternative lighting and basic supplies, and check its website for current schedules for the coming days.