Easter Rail Closures in Baden-Württemberg to Disrupt Travel
Deutsche Bahn confirms maintenance on Mannheim-Stuttgart and Karlsruhe-Basel lines, with replacement buses and delays expected.
- The Mannheim-Stuttgart rail line will be closed from April 17 to June 6, causing rerouted trains and delays of up to 40 minutes.
- The Karlsruhe-Basel (Rheintalbahn) line will shut down from April 18 to April 27, with travel times extended from 1 hour 40 minutes to approximately 3 hours due to bus transfers.
- Closures are driven by essential geological repairs in the Freudensteintunnel and upgrades to tracks, switches, and infrastructure on the Rheintalbahn line.
- Deutsche Bahn is deploying 100–130 replacement buses daily, though bicycles are not permitted on these services.
- The timing of the closures over Easter was chosen to minimize disruption during a period of reduced commuter traffic.