Particle.news

Download on the App Store

Dresden Nears Completion of Carolabrücke Demolition as Council Prepares to Vote on Replacement Design

City council is due to pick on June 19 among five lane proposals that will guide the bridge’s future with Elbe shipping suspended until September

Image
Image

Overview

  • The Carolabrücke demolition is entering its final phase as crews use excavators and loaders to remove the last steel and concrete debris.
  • City council members will choose on June 19 from five proposed designs providing between two and four vehicle lanes.
  • Officials have confirmed that a faithful reconstruction of the 1895 arch bridge is not feasible under current building regulations.
  • The Elbe River remains closed to commercial shipping until September, prolonging the disruption to river traffic.
  • The stripped wreckage has become a public attraction, drawing tourists and locals to photograph the site along the Brühlsche Terrasse.