Overview
- PWD Minister Parvesh Verma and Environment Minister Manjinder Singh Sirsa inspected the UER-2 junction on July 17–18 and directed consultants to identify and fix remaining design gaps
- Underpass and flyover construction at Shiv Murti intersection is underway to ease congestion on the UER-2 and Delhi–Gurugram–Jaipur highway link
- Tenders worth ₹14 crore have been floated for a seven-month detailed feasibility study of a 47 km integrated Transit Corridor featuring eight flyovers and underpasses
- The infrastructure initiative is aimed at cutting travel delays, lowering fuel consumption and reducing emissions at Delhi’s busiest choke points
- Officials are separately planning an elevated express corridor between Delhi and Gurugram to cut the 30-km commute to 25–30 minutes