Particle.news

Download on the App Store

Delhi Orders Fresh Review of Shiv Murti Underpass Works as Transit Corridor Study Begins

A fresh technical review of the Shiv Murti underpass and flyover has been ordered alongside tenders for a 47 km corridor feasibility study

Image
Image
Image
Traffic

Overview

  • PWD Minister Parvesh Verma and Environment Minister Manjinder Singh Sirsa inspected the UER-2 junction on July 17–18 and directed consultants to identify and fix remaining design gaps
  • Underpass and flyover construction at Shiv Murti intersection is underway to ease congestion on the UER-2 and DelhiGurugram–Jaipur highway link
  • Tenders worth ₹14 crore have been floated for a seven-month detailed feasibility study of a 47 km integrated Transit Corridor featuring eight flyovers and underpasses
  • The infrastructure initiative is aimed at cutting travel delays, lowering fuel consumption and reducing emissions at Delhi’s busiest choke points
  • Officials are separately planning an elevated express corridor between Delhi and Gurugram to cut the 30-km commute to 25–30 minutes