Particle.news

Download on the App Store

Deep Trench Work Underway as LADWP Targets Monday Morning Water Restoration

Work involves replacing a broken 54-inch valve buried beside oil, gas and fiber lines followed by system repressurization and testing to resume service at 3 a.m. Monday.

Image
Image
Image

Overview

  • Excavation has reached nearly 25 feet beneath the Susana Tank feeder pipeline to cut out the damaged valve and weld in a new section of pipe.
  • A temporary bypass coupling ruptured Saturday in Granada Hills, flooding a street and briefly pausing work before crews resumed 24/7 valve replacement.
  • High residential water use has depleted tank pressure and delayed the timeline by at least 48 hours, prompting officials to warn that running taps could push restoration past the 3 a.m. target.
  • A boil-water advisory remains in effect until post-repair testing is complete, and five emergency sites are offering bottled water, showers and laundry for roughly 31,000 affected residents.
  • LADWP is working with the Metropolitan Water District, Los Angeles Fire Department and state regulators to resupply the tank and plan contingencies for continued heatwave-driven demand.