Particle.news
Download on the App Store

Daytime Closures and Lane Reductions at A9/A70 BayreuthKulmbach Interchange Through Nov. 20

Bridge BW 295d repairs by Autobahn GmbH trigger a signed detour via Berneck-Himmelkron with the A9 toward Munich reduced to two lanes.

Overview

  • The works run Monday to Thursday, Nov. 17–20, daily from 08:00 to 18:00, with timings subject to short-notice changes by Autobahn GmbH.
  • At the interchange, the connection from the A9 coming from Bayreuth onto the A70 is closed during the daytime work windows.
  • Traffic on the A9 toward Berlin bound for Bamberg/A70 is diverted at the Berneck-Himmelkron junction to re-enter toward Munich and follow signs back to the A70.
  • In the bridge area, the A9 in the direction of Munich operates on two lanes for the duration of the repairs.
  • The Bindlach exit and entry remain open, and drivers are advised of additional restrictions on the A9 near Nuremberg.