Particle.news

Download on the App Store

Daman Ganga River Bridge Finalizes Valsad Segment of Bullet Train Corridor

Marking the 16th of 21 Gujarat river crossings, this bridge completion brings the corridor closer to its planned 2028 launch.

Image
Image
Image
Image

Overview

  • The National High Speed Rail Corporation Limited announced on July 8 that construction of the 360-meter Daman Ganga River bridge in Gujarat’s Valsad district is complete.
  • This structure is the 16th of 21 planned river bridges in Gujarat and completes all five crossings within the Valsad segment.
  • The bridge comprises nine full-span girders measuring 40 meters each and piers ranging from 19 to 29 meters in height to adapt to varying riverbed levels.
  • Situated between the upcoming Boisar and Vapi bullet train stations, the span lies roughly 1 kilometer from Vapi and 61 kilometers from Boisar.
  • The wider 508-kilometer MumbaiAhmedabad corridor will feature 25 river bridges and has over 300 kilometers of viaducts finished ahead of trial runs scheduled for early 2026.