Particle.news

Download on the App Store

ChargePoint, Eaton Launch Express Grid DC Microgrid Platform for Ultrafast EV Charging

Select customers can order now in North America and Europe, with deliveries slated for the second half of 2026.

Overview

  • Express Grid pairs ChargePoint ultrafast DC chargers with Eaton-engineered, DC-coupled microgrids that link onsite batteries and renewables directly to the chargers to cut conversion losses.
  • The companies claim roughly 30% lower capital cost, a 30% smaller footprint, and up to 30% lower operating expenses versus current solutions.
  • The system is V2X/V2G-capable, supports up to 600 kW for passenger EVs and up to 3.75 MW for heavy-duty trucks, and uses modular 600 kW power blocks that can split output across multiple ports.
  • Eaton will custom engineer site-ready power infrastructure with an optional skid-mounted configuration and plans to commercialize solid-state transformers within about a year following its Resilient Power Systems acquisition.
  • Initial deployments will be coordinated with participating utilities, the product will debut at the RE+ show in Las Vegas, and independent performance verification is still pending.