Particle.news

Download on the App Store

CFE Readies Next Gómez Palacio and Lerdo Outage as Epec Rolls Out Córdoba Maintenance Cuts

Scheduled shutdowns address urgent summer demand through infrastructure upgrades that avert unplanned failures.

Image
Image
Image
Image

Overview

  • CFE has scheduled another maintenance-driven power suspension for Thursday, July 31, cutting electricity from 10 a.m. to 6 p.m. in Quintas San Isidro, El Kiosco, San Gregorio and Francisco Javier Mina in Lerdo, and Hortensias, Primavera, Pánfilo Natera, 14 de Noviembre and Otilio Montaño in Gómez Palacio.
  • Epec’s preventive cuts today span multiple windows between 7:50 a.m. and 5 p.m. in towns such as Ausonia, Bengolea, Chazón and Ucacha as well as neighborhoods in Villa Carlos Paz, Estancia Vieja and Cruz del Eje.
  • Both utilities emphasize that these are planned maintenance operations rather than unanticipated blackouts and are critical for reinforcing aging grids.
  • Consumers are advised to plan activities ahead, disconnect appliances before power returns and keep flashlights, batteries and water on hand.
  • The maintenance campaign forms part of a broader regional strategy to strengthen energy network resilience during peak summer usage.