Overview
- El Imparcial and Excélsior released step-by-step guides showing how to apply for a second meter to allocate billing independently in shared homes, small businesses and rental units.
- CFE will approve only applications with no outstanding debts, service lines within 35 meters in urban areas or 50 meters in rural areas and electrical installations that comply with low-voltage safety norms.
- Applicants must submit a valid photo ID, a recent electricity bill in the owner’s name, the current year’s predial, RFC, full address details and a schematic of the proposed meter location at a CFE office.
- Qualified CFE technicians conduct an on-site feasibility visit after document submission to verify that the existing wiring can be safely separated before installation.
- While installation carries no direct charge, CFE requires a security deposit equivalent to the first bill and mandates that only its certified personnel perform the meter installation.