Particle.news
Download on the App Store

BMC Schedules 44-Hour Water Disruption Jan 20–22 Across Five Mumbai Wards

The operation reconnects a diverted Upper Vaitarna pipeline segment required for Metro Line 7A work.

Overview

  • Work runs from 9 am Tuesday, Jan 20, to 5 am Thursday, Jan 22, according to the civic body.
  • Parts of G North, K East, S, H East and N wards will see low pressure, altered timings or complete shutdowns.
  • K East is expected to be hardest hit, with large pockets in Andheri East, Marol, Chakala, SEEPZ and airport-adjacent areas facing full cuts.
  • Supply will be opened in phases at reduced pressure to manage flow, with exact timings to be shared a day in advance.
  • Residents have been urged to store water, use it sparingly, and boil or filter drinking water as a precaution.