Overview
- DuSable Lake Shore Drive was closed to cars from 6 a.m. to around noon between Bryn Mawr and 57th Street for the annual ride.
- The event began at 6:30 a.m. from Grant Park, with cyclists riding between Hyde Park and Edgewater in both northbound and southbound lanes.
- Sections began reopening to vehicles around 10:30 a.m., with full traffic expected to return between 11:30 a.m. and noon.
- Riders used designated entry points at Grant Park, Bryn Mawr, Fullerton, Oakwood, and the Museum of Science and Industry, with registration required.
- Organizers expected thousands of participants, and limited vehicle access was maintained near Interstate 55.