Particle.news

Download on the App Store

BESCOM Launches Second Phase of Daytime Outages in Bengaluru

Power will be halted from 10 a.m. to 5 p.m. in more than 100 Bengaluru neighbourhoods today to allow essential substation upgrades before peak demand

Power disruption in parts of Bengaluru on June 29 due to maintenance work
Image

Overview

  • The two-day maintenance drive runs June 29–30 across over 100 areas, with power suspension scheduled from 10 a.m. to 5 p.m.
  • Teams are servicing multiple 66/11 kV substations, replacing cables, trimming trees and inspecting RMUs to strengthen the distribution network.
  • Major thoroughfares and localities affected include Seshadri Road, Crescent Road, Race Course Road, Chalukya Circle, Kempegowda Road and parts of Subedar Chatram Road.
  • Residents are urged to charge electronic devices, store drinking water and arrange temporary power backups for essentials.
  • BESCOM is offering real-time updates through its social media channels, a dedicated WhatsApp helpline and the 1912 call centre for assistance