Particle.news

Download on the App Store

Berlin's A100 Ringbahnbrücke to Close Northbound Over Structural Concerns

The full closure, starting at 8 PM on March 19, 2025, follows the worsening of a critical crack in a load-bearing component, with traffic disruptions expected.

  • The Ringbahnbrücke of the A100 in Berlin will be fully closed in the northern direction starting at 8 PM on March 19, 2025, due to safety concerns over a worsening crack.
  • The closure affects the section where the A115 connects to the A100, a critical route for Berlin's traffic flow.
  • Temporary traffic management measures will redirect northbound traffic using the opposite lane to mitigate disruptions.
  • The S-Bahn line running beneath the bridge will remain operational for now, as confirmed by authorities after structural assessments.
  • A press conference is scheduled for March 20, 2025, to provide further updates on the situation and future plans.
Hero image