Particle.news

Download on the App Store

Bengaluru Road ‘Repaired’ on September 27 Reportedly Crumbles Within 48 Hours

The Channasandra Circle clip highlights pooling water at the site, prompting fresh complaints over shoddy patchwork.

Overview

  • Resident Auro posted a video on X stating the stretch fixed on September 27 had disintegrated by September 29 at Channasandra Circle.
  • The post tagged the Greater Bengaluru Authority and questioned the qualifications of engineers and contractors responsible for the work.
  • The footage shows visible seepage and standing water that the resident describes as a drainage leak undermining the repair.
  • The video quickly drew thousands of views with commenters demanding accountability and tougher action against poor-quality work.
  • A separate recent clip of flooding on the Marathahalli–Kadubeesanahalli Road, featuring content creator Lakshman Goswami assisting a commuter, underscored broader road and drainage woes in the city.