Particle.news
Download on the App Store

Barcelona Sells Out Camp Nou Open Training as Phased Reopening Begins

The session serves as a systems test ahead of the Phase 1B occupancy license.

Overview

  • FC Barcelona will host a public training on November 7 at Spotify Camp Nou with the 23,000-seat Phase 1A capacity sold out.
  • Attendance is limited to the Tribuna and Gol Sur sections as part of the controlled reopening plan.
  • The club says the event will validate access, systems and other operational elements required for broader use.
  • Additional tickets may be released if institutional or technical reservations are not used.
  • The first official match at the renovated stadium awaits the Phase 1B first-occupancy license, with the wider project targeting roughly 105,000 seats at a cost near €1.45 billion.