Overview
- Around 400 homes across Mountjoy House, Thomas More House, Seddon House, Lauderdale Tower and Lambert Jones Mews have had no water or very low pressure since Thursday.
- Thames Water engineers remain on site working to access a critical valve and have intermittently repressurised parts of the system, notably boosting tanks at Lauderdale Tower.
- Residents have been warned to prepare for disruption through the weekend, with no confirmed timeframe for a full return to normal supply.
- The City of London and the Barbican Estate Office delivered 10 litres of bottled water per flat, arranged first-come shower access at Nuffield Health and Golden Lane Leisure Centre, and are prioritising vulnerable residents for welfare checks and transport support.
- The wet riser at Lauderdale Tower is compromised, prompting hourly fire patrols and notification of the Shoreditch fire brigade, while E.ON reports flooding in the Citigen tunnels but says heat, chill and power remain available via backup systems.