Overview
- UK reports say Arsenal are assessing an increase from about 60,700 to beyond 70,000, with some coverage floating scenarios up to 80,000.
- Proposals focus on internal reconfiguration by altering stand gradients and seating layouts while keeping the outer bowl largely unchanged.
- Indicative costs are described as several hundred million pounds, with figures around £500 million cited across multiple outlets.
- A temporary relocation is under evaluation if large-scale works proceed, with Wembley viewed as the most practical option.
- The study aims to ease a 100,000-plus season-ticket queue and boost match-day revenue, with KSE’s stadium experience and Real Madrid’s Bernabéu revamp referenced as influences.