Overview
- The first A350F test aircraft, MSN700 registered F‑WXLD, completed a four‑hour, ten‑minute maiden sortie from Toulouse on Tuesday, September 29, 2026, to verify basic airworthiness and handling.
- Airbus has begun a flight‑test campaign expected to total about 400 hours over more than nine months with two prototypes, with MSN701 in late assembly set to join for systems and extreme‑condition trials.
- The A350F is a purpose‑built freighter that combines an A350‑900 forward fuselage with an A350‑1000 rear fuselage and wings, uses Rolls‑Royce Trent XWB‑97 engines, and features a 4.3‑metre main‑deck cargo door for large pallets and containers.
- Airbus had recorded 115 firm orders from 14 disclosed customers by the end of August 2026, positioning the type to compete directly with Boeing’s large freighters in long‑haul cargo markets.
- Airbus targets entry into service in 2027 but says timing depends on certification and supply items such as the large cargo door, while the A350F’s up to 40% fuel and CO2 improvements could speed fleet renewals and cut operators’ operating costs.