Overview
- The 20,000-square-metre facility lifts annual handling capacity to 200,000 tonnes from 50,000.
- Airport statements present the terminal as operational following its inauguration on September 5, 2025.
- Automated number plate recognition, handheld terminal operations, and barcode tracking provide real-time cargo visibility.
- A dedicated cold-chain zone and advanced handling equipment support temperature-controlled and high-value shipments.
- The airport says the terminal will serve a wider catchment, supporting exports such as engineering goods, garments, pharmaceuticals, and chemicals across the region.