Particle.news

Download on the App Store

Adif Awards €215.8M Contract for Valladolid-Campo Grande High-Speed Station

The contract launches preliminary design on a sustainable, accessible terminal above five new high-speed tracks with a revamped urban environment.

Image
Image
Proyecto de reforma de la estación de Valladolid-Campo Grande
El alcalde de Valladolid, Jesús Julio Carnero, en una imagen de archivo

Overview

  • The €215.8 million contract was awarded to a UTE led by Ferrovial along with Vías y Construcciones and local firm Zarzuela, triggering preparatory and design work.
  • Plans call for a 7,900 square metre elevated passenger hall featuring natural light, renewable energy systems and a solar-shading façade.
  • The station layout will include five standard-gauge high-speed tracks, three conventional lines and a new pedestrian bridge linking streets on both sides of the station.
  • Multimodal facilities encompass a four-level underground car park for 605 vehicles, taxi and bicycle zones and a kiss-and-ride drop-off area.
  • The upgraded terminal will reinforce Valladolid-Campo Grande as a key node on the northern high-speed Atlantic Corridor connecting Madrid with regional capitals.