Particle.news
Download on the App Store

A50 Hit Hard as Netherlands Rushes Emergency Road Repairs After Freeze–Thaw Damage

Road managers are deploying night crews for temporary patches, with severe sections receiving immediate full repairs.

Overview

  • Rijkswaterstaat counted about twenty large potholes over a 5‑kilometre stretch of the A50 between Vaassen and Epe and closed a full lane for thorough repairs, with work continuing on Friday.
  • Noord-Holland closed the N244 (Westdijk) in Alkmaar overnight from January 15 to 16 to fix frost damage, with traffic and bus line 123 rerouted.
  • Noord-Holland scheduled overnight closures on the N201 at the Waterwolftunnel in Aalsmeer from January 19 to 20 to repair potholes and manage tunnel tube access.
  • Crews are performing nightly temporary repairs across multiple routes, including the A1, A28 and A50 in the center and east, and the A7, A28 and N33 in Groningen.
  • Open-graded asphalt (ZOAB) and road salt are intensifying deterioration by trapping water that expands when frozen and by weakening the bitumen binder.