Particle.news
Download on the App Store

A3 Closure Triggers Long Jams on A59 as Bridge Demolition Advances

Traffic is funneled onto prescribed detours through Duisburg, where Tuesday’s morning peak brought multi‑kilometre queues on the A59.

Overview

  • The A3 is closed in both directions between Autobahnkreuz Oberhausen‑West and Kreuz Breitscheid from November 7 at 21:00 until November 17 at 05:00.
  • Demolition of connection bridges at Kreuz Kaiserberg requires a full shutdown for safety, with the operation tied to a larger interchange reconstruction.
  • Autobahn GmbH permits limited on‑ramp access at DuisburgWedau toward Cologne and Oberhausen‑Lirich toward Arnhem while maintaining the through‑traffic closure.
  • Official detours route drivers via A42–A59–A524, with Tuesday reports showing about 5 km southbound queues with roughly 30 minutes extra and 8 km northbound with about 20 minutes delay in Duisburg.
  • The wide‑area closure was coordinated with Duisburg and Oberhausen to deter cut‑through traffic, as other long‑term NRW roadworks and a planned Cologne Central Station rail shutdown from November 13–24 constrain capacity further.