Particle.news
Download on the App Store

42 Unauthorised Structures Razed in Andheri to Clear Way for Yari Road–Lokhandwala Bridge

Officials say the cleared site has been handed to the bridge department to start work after MoEFCC clearance over the mangrove zone.

Overview

  • The BMC and the Mumbai Suburban Collector’s office removed 41 residential structures and one religious structure at SVP Nagar under police protection.
  • Authorities said the parcel has been barricaded and transferred to the BMC bridges department to commence construction.
  • Residents allege the drive bypassed due process under the Slum Act, while officials maintain only undocumented homes were demolished.
  • The planned link will cross Kavathe Creek within a CRZ area where environmental permission has been secured from the Union environment ministry.
  • Project details reported include a 393.2‑metre span with a 110‑metre single‑span steel arch and approach roads on both sides, with proponents saying it will sharply cut current travel times.